Sunday, March 20, 2011

The End?

Perhaps you're wondering why I stopped posting here. Did the MBTA or MBCR suddenly make huge improvements in the Franklin line? Did I die, or flee the country?

No, no, and no. The explanation is much more mundane: I became a telecommuter. After thirteen years in the office, and eight or nine of those years commuting four hours a day from Rhode Island to Boston (round trip), my employer gave me the option to work from home. Deeply as I have always loved the city of Boston, I have to admit that the daily commute was taking a real toll on me. So I agreed.

It's a different life. Instead of waking up to a tortuous alarm clock before the sun rises and forcing my family to get up so they can drive me to the train station, I sleep late and wake up with plenty of time to stroll down the hallway to my work area. I can have lunch with my wife, and see my son as soon as he comes home from school. It's a whole new life, and a better one. I only wish that more people had that option!

But I do take the T in to Boston once in a while for meetings. And on a recent late-night trip home, I took another look at the crumbling staircase at Ruggles. A couple of photos came out clearly enough:

The side of the staircase is deteriorating badly. In this shot, you can actually see through the inner wall all the way through the interior hollow and to the inside of the outer wall. The other side of the outer wall is bulging worse than ever.

On the other side of the staircase, the situation is equally desperate. It's literally falling to pieces, as you can see here. Now, I actually led a T representative physically to this staircase last year and showed him what was going on, and he seemed to realize that there was a real danger. So I can't say why nothing has been done to rectify the situation, although I'd bet a shortage of funds will be blamed.

Other than that, I'm sorry to see that the T's thirty-minute money-back policy is apparently going to be discontinued, if it hasn't been ended already. This is nothing but an encouragement for even worse service.

So...am I glad to be off that train? Well, yes. I'd be dishonest if I didn't admit it. But I'll admit that I miss Boston, and once in a while I miss taking the train. I even miss the comic misadventures, lousy service, and rude conductors (noting, as always, that most conductors are not rude).

I'll continue to keep an eye on things on my rare trips to town, so this isn't the final post. But realistically, there certainly won't be as many posts as I used to make. I just don't have the material any more!

Wednesday, January 13, 2010

Slow-motion crash


The stairs at Ruggles continue to decay. The morter is crumbling away.


As you can see above, the whole structure has shifted so much that the
internal holes in one of the bricks have been exposed.


The staircase is slowly spreading outward at the base; another effect of this slow-motion collapse has been to pull apart the railing on the left side, as you walk downstairs.

On the outer side of the staircase, you can see that the wall is visibly bowing outward. I can't imagine that this is a safe situation! Would any public safety inspector allow a staircase in this condition to be used by the public? I have to doubt it.

The weird thing, of course, is that those stairs were closed for at least two years for repairs, and only re-opened in August 2007. Will they make it to August 2010? I don't know. Will they be closed for another two years for repairs again? I couldn't say. Will the next set of repairs last longer than three years? I'd like to believe so - but see no reason for hope!

Thursday, October 15, 2009

Strange morning, courtesy of the MBCR

Strange things were happening on the #708 train out of Franklin this morning. It was a double train, with an engine in the middle; I heard that the prior train had broken down, and was being pushed along.

I also saw my first "wrapped" coach, a double that had been turned into a huge advertisement for some bank. Here's a photo:


On the train, a woman had a large brown dog sitting on the seat next to her. It was some sort of hound, and was letting out a near-continuous high-pitched whine. I didn't see anything to indicate that it was a service dog. I couldn't tell if a ticket had been purchased for it, although it was using a full seat and it was VERY crowded on the train that morning. People were jammed in the aisles.

The train was due in at Ruggles at 7:50 AM, but didn't arrive until 8:24. So accordingly I put in for the on-time guarantee. I guess that will make up for the $8.75 I was charged for forgetting to change my pass on the 1st!

The stairway at Ruggles continues to deteriorate. Intriguing deep holes are opening up in the sides of it:

A week ago I saw that the afternoon Providence train (stopping at Ruggles on the outbound trip at roughly 3:56 PM) was incredibly crowded. People were jammed into the vestibule areas, between coaches - the areas with signs that say "PASSENGERS ARE NOT PERMITTED TO RIDE IN THE VESTIBULE". I counted at least ten people in one vestibule, and more than that in two others.

I also had an interesting ride home last week; when I got on the coach, it was pitch black inside. I mean really black; the only light came from a laptop that some guy was using down at the other end of the coach.


It was eerie! The power came back after about fifteen minutes, though.

Thursday, October 1, 2009

Mysterious Thing

It's boring, waiting for the train at Ruggles in the evening, so once again I was looking at the stairs. The disintegration continues, but today I saw something new:


What IS that thing? It looks like a heavy cable, almost like a motorcycle lock, clamped around the base of the stair railing - and the other end goes into the concrete. Where the insulation doesn't cover it, it's clearly a multiple-wire cable. It can't be electrical. It doesn't look as if it has any structural purpose - how could it be holding anything in place? It's not tightly attached! Why does it go into the cement? Does anyone know?

There's another cable just like it on the other side of the stairs, by the way.

You might have noticed that there are bricks missing at the left-hand bottom side of the base of the stairs now. Here's a better shot:




Could the cable be some sort of temporary thing, like a clamp to hold things in place? It really doesn't look like it to me.

Thursday, July 30, 2009

Crumbling stairs

Last December I wrote about the crumbling stairs to the commuter rail platform at Ruggles.

Here's what they look like today, Thursday July 30th. Click on the photos to enlarge them:







As you can see, the stairs are falling apart. And here's a view of the wall on the other side of the stairs; the damage isn't as obvious, but if you take a close look, I think you'll see signs that the wall is starting to bulge outwards...



That can't be good!

Monday, February 9, 2009

Trouble With A Capital T

Things haven't changed much on the Franklin commuter line.

There've been some late trains, and I've collected a few free tickets. The stairs at the Ruggles station are still crumbling. In the last couple of months there have been several times on the outbound #717 train (departing South Station at 4:20 PM) when no doors were opened on either side of two adjacent cars; twice I saw passengers who weren't able to get off the train at their stops, and ended up being carried along to the next station unwillingly. I tried to help one of them by opening the door and stairs myself, but by the time I'd noticed her plight and gotten the door open, the train was already in motion. There was, of course, no conductor around.

Today was pretty special, though. The morning #708 train was going very slowly. There were a couple of announcements; the #704 was disabled, and the #706 was joining up with it to push it out of the way. We were supposed to arrive at Ruggles at 7:50 AM, but we got there at 8:25 instead.

When we got there, people lined up to get out. But the lines didn't move in my coach. The doors were shut, and the passengers who were trying to open the doors...couldn't. They said they were stuck. I was far back in the line myself, or I would have given it a try. Needless to say, there was no conductor in sight.

We all turned around and started rushing down the coach to the next set of doors. But we hadn't reached them before we all realized that the train was moving, picking up speed. There was a univeral groan.

Fortunately someone reached a conductor, and the train finally stopped. We were well down the long Ruggles platform by then; all but two coaches were past the barrier that blocks off the crumbling, unused half of the platform (I'll get a photo of that soon, if I can - update: got it). We stepped out onto a continuous sheet of thick ice. Since it was an off-limits area, it had never been salted or sanded. We had to squeeze carefully around the wooden barrier, with no more than a few feet of clearance between the barrier and the train. It was a tight fit for some! And it may have been worse for the people on the other side, since if they slipped they wouldn't have the train as a backstop - they'd have ended up falling straight down onto the tracks. Luckily, no one slipped.


Here's a shot that I took of the closed platform that afternoon. It had been a relatively warm day, and the sun had melted some of the ice since that morning. But even so, there was a lot left! By the way, that half of the platform has been closed for as long as I can remember - years, at least. It's crumbling badly.
It could have been worse, of course - we could have been forced to get off at Back Bay instead, and been even more late. As it was, I got into work 40 minutes late. I later heard that people on the #704 train had had a two-hour delay!

P.S. - I've been told a great story that I hope to be able to post soon. The T apparently mailed out some duplicate letters and tickets for their On-Time Guarantee, and they're handling the issue remarkably poorly - even for the T. One suggestion: check your O-TG letters for duplicate numbers. If you find some, don't try to cash in duplicates at the same time. More on this later, I hope!

Thursday, December 4, 2008

The stairs, they are a-crumblin'

There have been the usual problems on the Franklin line in past months, including quite a few 30+ minute delays. These have become so routine that they're hardly worth an entry here.

But there's a much more interesting problem that has come to light at Ruggles recently.

The commuter rail station at Ruggles has two long stairways. One is entirely covered by the Ruggles roof, although water leaks copiously through that roof in many places and the stairs are often soaked on rainy days (even inside the main area of the station itself, it's often like a rain storm indoors on wet days).

The bottom of the other stairway extends out under the open sky. Here's a current photo from the top of the stairs:


That would be quite a fall, wouldn't it?

Now, that stairway was closed for two or three years straight because it was unsafe. Finally in August 2007 it was repaired and reopened. But in the sixteen or so months since it reopened, it has already decayed badly and it again seems very unsafe - an accident waiting to happen.

At least eight stairs are loose, partially detached from the underlying cement. Here's a video of one of them:



If you look closely, you'll see the surface of the stair pop upwards as it's stepped on by the passing commuter, and then fall back down again. You can hear it click as it moves.

It seems that T personnel may not have actually repaired the stairs; I may be wrong, but it looks as if instead they just covered them with new non-skid surfaces. That might be a perfectly adequate replacement (I don't know, I'm not a safety expert) except for one small problem: the nails (or possibly screws) that they used to attach those new surfaces to the underlying, possibly crumbling cement steps are melting. Whatever they're made of, they're fast rusting away to featureless spikes - some are completely gone. And many of the stairs are half-loose from the underlying surface as a result.



Perhaps that rusting process will suddenly stop. But I don't think so. You can't help but wonder about the competence of an organization that would use fasteners liable to rust on an outdoor repair job! Suddenly, the many problems of the Big Dig seem less surprising.

I suspect that the stairway is going to be closed again for repairs, soon. How many years might that process take this time? In 2005-2007, the economy was relatively healthy and the T's budget situation might not have been quite as bad as it is now. So how long will commuters at Ruggles have to put up with either dangerous stairs, or only a single usable stairway?

Apart from the loose stair surfaces, there are a number of steps that have a curious bounce to them when stepped on. It almost feels as if the rubbery surfaces are unsupported; as if the concrete which is supposed to underlie them simply isn't there. The mortar-like substance that was used on the sides of the steps has broken and crumbled away in many cases. But at the very bottom stair, the cement of the underlying step can be seen - and it's not a pretty picture.

Or video, in this case:



What the heck; here's a picture, too.



Notice the rust, and the badly decayed condition of the step. How do the other steps look, I wonder, under their non-skid covering?

And how much could the MBTA and the state be sued for, if (when?) one of those steps gives way, and one or more people are catapulted down that long flight of stairs? How much of the upcoming rate increase would a multi-million dollar settlement eat up?

Lastly, what would it take to get a professional repair job done? I can't imagine it would be more expensive than the liability that the T seems to be courting with their incredibly poorly-maintained facility at Ruggles.

Thursday, August 9, 2007

Ruggles Station: Stairway to Hell?

Sometimes you miss something that's right under your nose. Or I do, anyway.

I was talking to one of the regular riders on the #715 Franklin train, and she pointed out something that jolted me: there's only one staircase and one elevator for the entire commuter rail platform at Ruggles.

There used to be a second staircase, but it started crumbling about three years ago and the T blocked it off. They locked and chained the upper doors, and put up a section of chain link fence to block the bottom of the stairs.

And then they sat back and let it crumble. It's just been decaying for the last three years. The chain link fence is partially broken in, but the whole staircase is clearly a hazard - it's literally falling apart. Chunks of masonry are falling off of it!

This is one of those stories where a picture would be worth more than a thousand words. So tomorrow I'll bring in my camera and take a photo of it to post here.

I wonder...are there any laws about adequate access to commuter rail platforms? If there's ever an emergency that requires passengers to get off the platform and up to the station quickly, that lone staircase would be quite a bottleneck. Which it is every morning, come to think of it.